Short answer: In Miami, permits are issued by City of Miami Building Department; of the 6 common projects we checked, 4 always need a permit, 0 do not, and 1 depend on the details (1 unverified).

Permitting authority: City of Miami Building Department. Applies in the City of Miami only. Other Miami-Dade municipalities and unincorporated Miami-Dade County have their own building departments. Miami is in the High-Velocity Hurricane Zone.

Permit rules in Miami
ProjectAnswerVerified
DeckUnverified, confirm locally
We did not find an official City of Miami statement on deck permits.
2026-10-19
FencePermit required
Yes. The City lists fence permits for fences up to 6 ft, and fences over 6 ft also need structural review.
2026-10-19
Interior / bathroom remodelDepends on your project
Replacing bathroom cabinets and countertops is exempt if no plumbing, wiring or load-bearing walls change. Changing out a tub, toilet or oth…
2026-10-19
Roof replacementPermit required
Yes. Residential reroofing (shingle, tile, metal or flat roofs) needs a permit.
2026-10-19
ShedPermit required
Yes. Setting up a prefabricated shed is listed among common residential permits.
2026-10-19
Water heater replacementPermit required
Yes. Water heater replacement is listed among residential permits, and gas appliance repair exemptions exclude water heaters.
2026-10-19

Fee schedule: https://www.miami.gov/My-Government/Departments/Building/Residential-Permit-Guide